Nowadays, many factories will be installed on a roll mill. After installation, we can use it. The details will be noted when installing. What do we pay attention to during the installation process? Before installation must understand:
1, the installation position of the crusher has a great relationship, different locations of the broken rod mill installation site is different, generally installed in the factory or mostly open operation.
2, check the connections of each component, should be firm and reliable, carefully check if there is foreign matter on the impeller, if it should be excluded in time. Check if the motor wiring is correct, whether the voltage is normal.
3, before the rod mill is installed, in accordance with the box list, check that the various pieces have no damage during transportation, and whether the parts and spare parts are complete.
4, before adjusting the factory, the manufacturer has been running in the hourly factory, and the parties are normal. Despite this, after installing the on-site installation in the rough sand machine, it should still be fully inspected whether the lubricating oil pipe is connected. The oil should be rejected before the trial operation.
5. Before installing the belt, start the motor, and the rotation direction should be consistent with the direction of the rod mill, and the impeller is rotated in the direction of the blade. If the motor wiring should be adjusted, so that it should be adjusted The triangular triangular tape in the same amount of triangular tape with the main shaft assembly with the same number of triangular tape in the same amount of triangular tape with the main shaft assembly with the same number of triangular tape.
During the installation of the rod mill, we must check that there is no reduction in related accessories. Also check if there is foreign matter, pay attention to clean the equipment in time to prevent clogging. Alternately, it is necessary to fix the accessories.