Home >> News

Preparation before installation of ball mill

2021-10-28 17:06:43

views:

1. Before installation, all parts and components must be processed on the surface of the processed work surface to remove dust and soil in transportation.

2, check each process work surface and thread, and will be eliminated in the defects generated during transportation and loading and unloading.

3, the components that are equipped should be carefully checked. If some parts are damaged or lost during transportation and storage, the defective parts must be repaired and lost.

4, the contact (or connection) of the installation (or connection) The surface should be lubricated, the fixed surface is dried with dried oil, and the surface of the movable surface is used.

5. Before installation, all the slots and pits are cleaned on the basis, and the surface of the cement cement should be made not allowed to be fine.

6, the installation should protect the fabric surface, no cotton yarn or unclean oil to scrub, the parts of the parts can be easily dirt, should be applied to a special guard and a clean canvas cover.

Share:

Related Products

Related News